Illinois Rte 3 Relocation in St. Claire County IL

Illinois Rte 3 Relocation in St. Claire County IL

This project included the construction of two new bridges that takes relocated Illinois Rte. 3 over three separate railroads, the Union Pacific, Kansas City Southern and over the Terminal Railroad. The job also consisted of two MSE walls totaling over 8,000 Square Feet with heights over 34 feet, along with two load transform plates built with Controlled Concrete Modules.

Shalom provided construction management to monitor, observe and manage the construction of all elements including all roadways, excavations, embankments, structures, concrete, foundation, retaining walls, storm sewers, seeding and erosion control items.