info@shalomincorp.com

US 75 to FM 78, Plano, (NTTA)

US 75 to FM 78, Plano, (NTTA)

Prime contractor was Webber
• Concrete mowstrip construction (4 inches)
• Riprap construction (Concrete) (4 inches
• Riprap construction (Concrete) (5 inches